Adot Begins Paving On Us 70

Posted 11/1/17

BYLAS — The Arizona Department of Transportation has started a pavement project on 4 miles of US 70 in Bylas, and advises drivers to plan for lane restrictions through spring 2018.

This item is available in full to subscribers.

Please log in to continue

Log in

Adot Begins Paving On Us 70

Posted

BYLAS — The Arizona Department of Transportation has started a pavement project on 4 miles of US 70 in Bylas, and advises drivers to plan for lane restrictions through spring 2018.

The project is located within the boundaries of the San Carlos Apache Reservation, beginning at Calva Road at milepost 293, and continuing east to milepost 297. 

Lane restrictions maintain a minimum of one lane of traffic for both directions. They are scheduled to occur from 6:30 a.m. to 4 p.m. Mondays-Fridays through spring 2018. The speed limit in the work zone will be reduced from 50 mph to 35  mph.

Drivers and pedestrians should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.